What to Do When a Subcontract Changes After One Party Signs

By SubDoc Editorial Team ·

A subcontractor signs on Monday. On Tuesday, your estimator spots the wrong pricing exhibit. The general contractor hasn’t signed yet, and the signing request is still open. What do you do?

Pause the signing process, save the version the subcontractor signed, and have the person authorized to manage the agreement decide how to handle the revision. Before signing resumes, confirm which document and exhibits each party will see, who needs to sign, and what should happen to the earlier request.

Check what changed and who already signed

Start with the packet attached to the original request. Write down its revision, the exhibits it included, who signed, and who was still pending when you found the issue. Save the original files and any available signing history together.

Then compare the proposed correction with what was sent. A typo in a pending recipient’s email address calls for a different review than a change to the price, scope, schedule, or an attached exhibit. For a change to the agreement itself, give the contract owner the old packet, the proposed revision, and a short description of the difference.

If the request completes while the issue is under review, flag that immediately. If work has already started or the parties disagree about what they accepted, involve the appropriate contract or legal reviewer before issuing a replacement.

Decide how to handle the original request

Ask the contract owner to confirm how to handle the earlier request, which document should go out next, and whose signatures are needed. Depending on the agreement and its status, the next step may be a replacement packet, an amendment, or a change order. A signing platform’s status tells you what happened to the request. The effect on the agreement depends on the facts and applicable law.

Check the platform’s current instructions before changing anything. For example, Adobe Acrobat Sign lists an unsigned agreement among the conditions for using its Modify Agreement feature to change documents or fields. That feature also depends on plan and workflow. Adobe Acrobat Sign documentation

Worked example: a $3,000 change to the pricing exhibit

In this fictional example, a subcontractor signs SC-047-v2, which includes a $48,000 pricing exhibit. Before the general contractor signs, the estimator discovers that the issued exhibit omitted $3,000 for weekend work. The corrected total is $51,000.

StepWhat the coordinator does
Capture the originalSaves v2, the $48,000 exhibit, the signing history, and the request ID. Records that the subcontractor signed and the general contractor was pending.
Get the revision approvedSends the contract owner a comparison showing the added weekend work and the $51,000 total. Records the approval for v3 and the decision on the original request.
Check the replacement before sendingOpens the packet from the signing preview and verifies that both the agreement and its attached exhibit show the approved amount. Checks the recipients against the approved signer list.
Close the loopOpens the completed export, confirms the revision and exhibit, and links its request ID back to v2. Updates the project record with the accepted file and where to find it.

The most useful check is the one someone can repeat later. In this case, that means opening the actual packet and comparing the price in the agreement with the price in the attached exhibit. A filename containing v3 can’t tell you whether the old exhibit was accidentally carried forward.

Send a short pause notice

Please pause signing request [request ID] for [project]. We found a discrepancy in [document or exhibit] and are reviewing the revision. If you already signed or approved the request, please let [coordinator] know. We’ll send separate instructions once the revised packet and signing steps are confirmed.

Once there’s an approved next step, identify the document revision and describe the change in the new message. Give recipients a clear way to tell which packet they’re being asked to review.

Keep both versions traceable

Use one row in your project log for the revision. Capture the original request ID and version, what changed, who approved the revision, what happened to the earlier request, the replacement request ID, and the final file location. Keep the original signing history associated with the original packet.

Where law requires retention of a record for a transaction in or affecting interstate or foreign commerce, the federal E-SIGN Act’s retention provision addresses accuracy, access for entitled people, and the ability to reproduce the record for later reference during the required period. Confirm which retention rules apply to your agreement. 15 U.S.C. § 7001(d)

For the normal signing and filing process, see How to Sign a Subcontractor Agreement Electronically. If the scope changes under an existing agreement, see Subcontractor Change Orders.

This content is general information, not legal, insurance, or professional advice. Insurance and contract requirements vary by state, project, and policy. Consult a licensed attorney or insurance professional before relying on it.